ACE2, VODYANITSKIY Met Period 1
Days 171.0 to 177.0, 20-June to 26-June
Significant events at the ship during this period.
-
June 21 (172) - June 22 (173): 2300 to 0700 intercomparison with
Sagres
-
June 24 (175), June 25 (176), June 27 (178), June 30 ( 181): Potential
radiometric calibration of POLDER
-
June 25 (176): Clear Lagrangian with Sagres, ship, and C130 (but
C130 did not pick up balloon signal
Meteorological Summary: A front moved through the region just
north of the ACE-2 area on 21-22 June (Days 172-173). The 950 and 850mb
back trajectories were from the west until 24 June, when they began arriving
from over Spain and Portugal. Boundary Layer heights went from 600m on
day 172 to 2700m on day 174 before lowering back to the 300 - 500m range
on day 176.
Met data available for Period 1
-
Large cruise track map.
-
Meteo outlooks, from the ops centre
-
Radiosonde, Relative Humidity and winds,
0 to 5 km altitude (see notes on main met page).
-
Radiosonde, Potential Temperature and
winds, 0 to 5 km altitude (see notes on main met page).
-
Boundary Layer Heights (see notes on main met
page).
-
Surface Met data from ship.
-
Radon and Ozone at the ship.
-
Satellite - Maps
-
20 June, 00Z IR; 12Z VIS,
IR, WV;
14Z AVHRR, 00Z
surface map;
-
21 June, 00Z IR; 12Z VIS,
IR, WV;
14Z AVHRR, 00Z
surface map;
-
22 June, 00Z IR; 12Z VIS,
IR, WV;
14Z AVHRR, 00Z
surface map;12Z back trajectories;
-
23 June, 00Z IR; 12Z VIS,
IR, WV;
14Z AVHRR, 00Z
surface map;12Z back trajectories;
-
24 June, 00Z IR; 12Z VIS,
IR, WV;
14Z AVHRR, 00Z
surface map;12Z back trajectories;
-
25 June, 00Z IR; 12Z VIS,
IR, WV;
14Z AVHRR, 00Z
surface map;12Z back trajectories;