Entity: Memphis-Shelby County Port Commission
Amount: $0
Project Description: Amend the Memphis Harbor project authorization to include the adjacent Pidgeon Industrial Harbor and to provide harbor maintenance at Federal cost.

Entity: Riverfront Development Corporation
Amount: $30,000,000
Project Description: To design and construct riverfront improvements and water infrastructure on the Mississippi River, Wolf River Harbor, and adjacent lands in Memphis.

Entity: University of Memphis - Center for Earthquake Research and Information
Amount: $6,000,000
Project Description: The Army Corps of Engineers will utilize geophysics to minimize the disruption of navigation, levee failure and damage to man-made infrastructure induced by earthquakes.