Bill Text Versions
106th Congress (1999-2000)
H.R.3986


THIS SEARCH     THIS DOCUMENT     GO TO
Next Hit        Forward           New Bills Search
Prev Hit        Back              HomePage
Hit List        Best Sections     Help
                Contents Display   

{title: 'THOMAS - Bill Text Versions- H.R.3986', link: 'http://thomas.loc.gov/cgi-bin/query/z?c106:H.R.3986:' }

There are 5 versions of Bill Number H.R.3986 for the 106th Congress. Usually, the last item is the most recent.

1 . To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (Introduced in House - IH)[H.R.3986.IH][PDF]
2 . To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (Reported in House - RH)[H.R.3986.RH][PDF]
3 . To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (Engrossed in House [Passed House] - EH)[H.R.3986.EH][PDF]
4 . To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (Enrolled Bill [Final as Passed Both House and Senate] - ENR)[H.R.3986.ENR][PDF]
5 . To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (Referred in Senate - RFS)[H.R.3986.RFS][PDF]

THIS SEARCH     THIS DOCUMENT     GO TO
Next Hit        Forward           New Bills Search
Prev Hit        Back              HomePage
Hit List        Best Sections     Help
                Contents Display