Congressman Connie Mack (FL-14) submitted the following requests on May 14, 2009, on behalf of Southwest Florida for the 2009 Highway Surface Reauthorization Bill:

CHARLOTTE COUNTY:

U.S. 41 Enhancement: SR-776 to North Port ($9 million requested): This funding will be used for the design and construction of U.S. 41 Corridor improvements. Improvements to this approximately five-mile segment of U.S. 41 will include a widening from four to six lanes with modifications to a number of existing intersections, upgrading the signalization, and drainage system improvements.

LEE COUNTY:

SR-78 Widening (Chiquita Boulevard to Burnt Store Road) ($25 million requested): This project includes the widening of SR-78 from two lanes to four lanes from Chiquita Boulevard to Burnt Store Road. In addition, this funding will be used for right-of-way acquisition and construction.

COLLIER COUNTY:

I-75/Davis Boulevard SR-84/Collier Boulevard/SR-951 ($20 million requested): This funding will be used for the complete design and re-construction of the interchange I-75, SR/CR-951 (Collier Boulevard) and Davis Boulevard SR-84. Funds will be used for the next appropriate phase, which may include design, right-of-way, mitigation or construction, depending on funding.

CR/SR 951 at U.S. 41: Intersection Improvement ($20 million requested): This funding will be used for the design and construction of grade-separated intersection improvements at U.S. 41 and CR/SR 951 (Collier Boulevard).

NOTE: These are only requests; they have not been funded by Congress yet.

Office Locations

  • Washington, D.C.

    115 Cannon House
    Office Building
    Washington, D.C. 20515
    Phone: 202-225-2536
    Fax: 202-226-0439
  • Cape Coral, FL

    804 Nicholas Parkway E.
    Suite 1
    Cape Coral, FL 33990
    Phone: 239-573-5837
    Fax: 239-573-9125
  • Naples, FL

    3299 Tamiami Trail East
    Suite 105
    Naples, FL 34112
    Phone: 239-252-MACK (6225)
    Fax: 239-252-8065
Office Locations Map