County of Gloucester |
1 North Broad Street, P.O. Box 337, Woodbury, NJ 08096 |
Gloucester-Salem Counties Unconsolidated Regional Wastewater Treatment Facility |
$17,000,000 |
Construction of a regional sanitary wastewater interceptor system, pumping stations and force mains throughout Gloucester and Salem counties, which are currently without municipal wastewater treatment. |
Mantua Township Municipal Utilities Authority |
397 Main Street, Mantua, NJ 08051
|
500,000 Gallon Water Storage Tank Rehab |
$194,000 |
Rehabilitation of a 50-year-old 500,000-gallon potable water tank which is one of two tanks supporting 70 miles of pipe and infrastructure and over 5,000 people. |
Mantua Township Municipal Utilities Authority |
397 Main Street, Mantua, NJ 08051
|
Hausman Sewer Expansion for Affordable Housing |
$330,000 |
To expand the sanitary sewer collection system to reclaim a brownfields site for the township to meet its state affordable housing obligation. |
Borough of Collingswood |
678 Haddon Avenue, Collingswood, NJ 08108
|
Collingswood Water Treatment Plant Upgrade |
$4,000,000 |
Upgrade the existing water treatment plant facility that services approximately 20,000 people, including Collingswood, Woodlynne, and a portion of Haddon Township. The goal is to remove contaminants by replacing the existing water filtration system, which is over 50 years old. |
Borough of Berlin |
59 South White Horse Pike, Berlin, NJ 08009
|
Redrilling of Well No. 10 |
$538,207 |
The project proposes to redrill an existing out of service well to a depth of 450 feet to replace an existing contaminated well in another location. |
Washington Township MUA |
152 Whitman Drive, Turnersville, NJ 08012 |
Washington Township MUA Well No. 21 |
$1,450,000 |
Updating Well 21 and construction of well house, well pumping system and transition main for a new 1,000 GPM well in the cohansey formation. |
Borough of Haddon Heights |
625 Station Avenue, Haddon Heights, NJ 08035 |
Haddon Heights Water Resource Development Act of 2010 Program
|
$1,250,000 |
This project involves improving the four sanitary pump stations located in the Borough. The Program will bring all four pump stations into compliance with the current NJDEP regulations. As part of this project we will also raise the Lake Street Pumping Station approximately 6 feet to remove it from the floodplain. |
Borough of Haddonfield |
242 Kings Highway East, Haddonfield, NJ 08033 |
Grove Street Sanitary Sewer Replacement and Pump Station Elimination |
$900,000 |
Replacement of old clay sewer mains with new watertight PVC piping and the elimination of a sanitary sewer pump station that overflows into the adjacent Cooper River. |
Township of Haddon |
135 Haddon Avenue, Westmont, NJ 08108 |
Flood Control Project at Chestnut and Westmont Avenues |
$900,000 |
The project includes the construction of subsurface storage facilities and detention basins to control flooding in an area of the Township of Haddon. |