Listed below are Congressman Altmire's federal funding requests for the Surface Transportation Authorization bill. This legislation will lay out the federal
government’s transportation and infrastructure funding priorities for
the next five years. As the only western Pennsylvanian on the House
Transportation and Infrastructure Committee, Congressman Altmire is
working to secure funding that will improve western Pennsylvania’s
infrastructure and pave the way for our region’s long-term economic
growth.
It is important to note that all of these requests are still being
reviewed by the House Transportation Committee. There is no guarantee
that any of these project requests will be funded.
City of Aliquippa
S.R. 3016 (Kennedy Blvd.)
Requested Amount: $3 million
Funding will be used to engineer and repair S.R. 3016 and to improve drainage along the road.
Allegheny County Sanitary Authority (ALCOSAN)
Urban Highway Runoff Mitigation - Route 28 Projects (Aspinwall)
Requested Amount: $2 million
Funding will be used to re-route the stream under Route 28 to lessen impact on streets and businesses and prevent overflow of sewer systems.
Beaver County
Freedom Road Upgrade
Requested Amount: $12.7 million
Funding will be used to upgrade the Crows Run Corridor of Freedom Road from Route 65 to Route 989.
Beaver County
Veterans Memorial Bridge
Requested Amount: $4.8 million
Funding will be used to design and construct a new bridge over the Beaver River.
Big Beaver Borough
Norwood Drive Reconstruction
Requested Amount: $792,500
Funding will be used for construction to prevent the persistent sliding of Norwood Drive.
Buffalo & Pittsburgh Railroad
Southwest PA Bridge Safety Upgrades
Requested Amount: $1.75 million
Funding will be used to upgrade and repair bridges on the Buffalo & Pittsburgh Railroad.
Buffalo Township
S.R. 0356
Requested Amount: $3 million
Funding will be used to plan, design and execute a widening and signalization project, as well as to coordinate and relocate utilities around S.R. 0356 in Buffalo Township.
Butler County
Route 228 Corridor Improvements at the I-79 Interchange
Requested Amount: $4 million
Funding will be used to design and construct new ramps and to widen the roadway for additional lanes.
Butler County
Route 228 Corridor Improvements at Mars Railroad Bridge to Mars-Valencia Intersection
Requested Amount: $2.5 million
Funding will be used to improve the Route 228 Corridor between Mars Railroad Bridge and Mars-Valencia intersection.
Clinton Township
Cox's Corner
Requested Amount: $500,000
Funding
will be used to improve the safety and efficiency of the intersection
at Saxonburg Boulevard and Westminster Road in Clinton Township.
Cranberry Township
Freedom Road
Requested Amount: $1 million
Funding will be used for planning, engineering, acquiring environmental clearance and right of way for widening the bridge over I-76 on Freedom Road.
Daugherty Township
Traffic Signal at S.R. 68 and Marion Hill Road
Requested Amount: $175,000
Funding will be used to design and construct a traffic signal at the intersection of S.R. 68 and Marion Hill Road.
Daugherty Township
Frishkorn Road
Requested Amount: $195,000
Funding will be used for the paving of Frishkorn Road and the installation of a pre-purchased bridge.
Ellwood City
Second Street Bridge Replacement
Requested Amount: $2.8 million
Funding will be used for the design, planning, and replacement of the Second Street Bridge.
City of Farrell and Mercer County Metropolitan Planning Organization (MPO)
Broadway Ave. (PA Route 60) Improvement in Wheatland, Farrell, and Sharon
Requested Amount: $500,000
Funding will be used for pedestrian safety improvements along PA Route 60, including construction of a cement concrete sidewalk, blockstone foundation, and vehicular pavement markings.
Freedom Borough
Road Repairs in Freedom
Requested Amount: $400,000
Funding will be used for road and street repair in Freedom, PA.
Greene Township
US Route 30 (S.R. 0030 Section B07)
Requested Amount: $6 million
Funding will be used for an additional turn lane at the intersection of Route 30 and Red Dog Road.
Hampton Township
Duncan Ave. and Rt. 8 Improvements
Requested Amount: $1.1 million
Funding will be used to design and construct the widening of PA S.R. 8 and the realignment and widening of Duncan Avenue.
Harrison Township
Karns Road Reconstruction
Requested Amount: $100,000
Funding will be used for the planning, design, and reconstruction of Karns Road in Harrison Township.
Indiana Township
Cove Run Road
Requested Amount: $400,000
Funding will be used to improve Cove Run Road in Indiana Township and to prevent its annual closure from November-April due to hazardous grades and curves.
Marshall Township
Thorn Hill Road/Brush Creek Road/Commonwealth Drive Improvements
Requested Amount: $263,000
Funding will be used to plan and execute the widening of the northbound Brush Creek Road approach at Thorn Hill Road and Commonwealth Drive to accommodate a right turn lane. Funding will also be used to construct improvements on the eastbound approach of Thorn Hill Road at Brush Creek Road and Commonwealth Drive to improve efficiency and safety.
Marshall Township
Wexford-Bayne Road (S.R.910)/Cole Road Traffic Signal
Requested Amount: $125,000
Funding will be used for signalization at the intersection of Wexford-Bayne Road and Cole Road.
Town of McCandless
Pine Creek Road and Blazier Drive Intersection
Requested Amount: $1.75 million
Funding will be used to add a turning lane and traffic signal at the intersection of Pine Creek Road and Blazier Drive.
Midland Borough
Brookwood Drive Bridge Replacement
Requested Amount: $150,000
Funding will be used for the replacement of the Brookwood Drive Bridge.
Midland Borough
Traffic Systems Upgrade
Requested Amount: $225,000
Funding will be used to replace the signal controller systems at various intersections along Midland Avenue.
City of New Castle
New Castle Street Paving Project
Requested Amount: $1 million
Funding will be used to pave sixteen streets in New Castle.
City of New Castle
Rail Crossing at Grant Street
Requested Amount: $136,800
Funding will be used to construct needed upgrades to accommodate the opening of the new Grant Street Bridge.
North Sewickley Township
Chapel Drive Link Bridge Superstructure Replacement
Requested Amount: $2 million
Funding will be used to replace the superstructure of the Chapel Drive Link Bridge.
North Sewickley Township
Country Club Bridge Preservation
Requested Amount: $50,000
Funding will be used to rehabilitate and preserve the Country Club Bridge in North Sewickley Township.
Borough of Oakmont
Requested Amount: $500,000
Edgewater Brownfield Redevelopment
Funding will be used to reconstruct two intersections in Oakmont, near the Edgewater Brownfield site, that have been classified as deficient in traffic studies.
O’Hara Township
Fox Chapel Road Improvements
Requested Amount: $205,000
Funding will be used to plan, design, and construct improvements including widening and signalization on a section of Fox Chapel Road where it intersects with Delafield Road in O’Hara Township.
Patterson Township
Ross Hill Road Reconstruction
Requested Amount: $2.5 million
Funding will be used for the design and installation of two walls to prevent persistent roadway sliding.
Pulaski Township
Coffee Run Road Bridge Replacement
Requested Amount: $25,000
Funding will be used to replace a one lane, box culvert bridge on Coffee Run Road in Pulaski Township.
Redevelopment Authority of Allegheny County
Allegheny Valley Commuter Rail Project
Requested Amount: $6 Million
Funding will be used to complete planning and design for the Allegheny Valley Commuter Rail Project.
Redevelopment Authority of Allegheny County
Tech 21 Office Park
Requested Amount: $3 million
Funding will be used for the addition of turning lanes on Warrendale Bayne Road and Route 19 and to widen on- and off-ramps to the Warrendale Bayne entrace of Route 79.
Redevelopment Authority of Allegheny County
Allegheny Ludlum Expansion Project
Requested Amount: $4 million
Funding will be used to accommodate transportation needs associated with the new rolling mill at Allegheny Technologies’ Brackenridge Plant.
Richland Township
S.R. 0008 (William Flynn Highway) Widening
Requested Amount: $1 million
Funding will be used for the planning, engineering, and construction necessary to widen S.R. 0008.
Ross Township
Perrysville Streetscape Improvement Project
Requested Amount: $1 million
Funding will be used for design and construction of improvements to sidewalks and the streetscape along Perry Highway.
Sewickley Borough
Ohio River Blvd. Signalization Project
Requested Amount: $1 million
Funding will be used to improve signalization and traffic flow on Ohio River Blvd.
Shaler Township
Route 8 Signalization and Improvements
Requested Amount: $1.5 million
Funding will be used to acquire right-of-way, plan, design and construct improvements at the intersection of Old Butler Plank Road and Route 8, including widening and signalization.
South Beaver Township
Swamp Poodle Road Bridge Replacement
Requested Amount: $112,000
Funding will be used for design and installation of a pre-fabricated bridge at Swamp Poodle Road.
Urban Redevelopment Authority of Pittsburgh
Interstate 579 "Cap"
Requested Amount: $1.5 Million
Funding will be used to design and construct an overpass covering over I-579 between downtown Pittsburgh and the Lower Hill District.
Wayne Township
Wampum Avenue Bridge Rehabilitation
Requested Amount: $2 million
Funding will be used to engineer and rehabilitate the Wampum Avenue Bridge.
|