SETTING SPACE TRANSPORTATION
POLICY FOR THE 1990s
 
 
October 1986
 
 
PREFACE

The loss of the space shuttle Challenger has raised important issues in national space policy, including: should a replacement orbiter be purchased and, if so, how should it be financed; and what institutional arrangement should the United States adopt to participate in the international market for satellite launches? This special study, requested by the Senate Committee on Commerce, Science and Transportation, investigates these and other issues affecting the future U.S. role in space. In keeping with the Congressional mandate to provide objective nonpartisan analysis, the report makes no recommendations.

David H. Moore, of the Congressional Budget Office's (CBO) Natural Resources and Commerce Division, prepared the report, under the supervision of Everett M. Ehrlich. Mark R. Dayton, Paul DiNardo, and Lane Pierrot of CBO provided valuable comments and assistance. Many outsider reviewers, including individuals from the aerospace industry, made helpful comments and criticisms. Patricia H. Johnston edited the manuscript, and Kathryn Quattrone prepared the manuscript for publication.
 

Rudolph G. Penner
Director
October 1986
 
 


CONTENTS
 

SUMMARY

CHAPTER I - INTRODUCTION

CHAPTER II - FEDERAL AND COMMERCIAL DEMAND FOR SPACE TRANSPORTATION

CHAPTER III - SPACE TRANSPORTATION SUPPLY

CHAPTER IV - OPTIONS


TABLES
 
Table 1.  OFFICIAL CASE DEMAND PROJECTIONS, BY MAJOR COMPONENTS, 1986 THROUGH 2000
Table 2.  U.S. SPACE LAUNCHES, 1970 THROUGH 1985
Table 3.  DEMAND PROJECTIONS FOR TWO ALTERNATIVE CASES, 1986 THROUGH 2000
Table 4.  CONSTRAINED CASE DEMAND PROJECTIONS, BY MAJOR COMPONENTS, 1986 THROUGH 2000
Table 5.  U.S. SPACE LAUNCH CAPACITY IN 1989 AND EXPANSION OPTIONS
Table 6.  FOREIGN ELV CAPACITY IN THE EARLY 1990s
Table 7.  THE EVOLVING LIFT CAPABILITY OF U.S. ELVS
Table 8.  ILLUSTRATIVE U.S. ELV INTERIM AND SUSTAINED PRODUCTION RATES
Table 9.  ESTIMATED U.S. ELV UNIT COSTS FOR THE COMMERCIAL MARKET
Table 10.  ALTERNATIVE DEMAND PROJECTIONS COMPARED WITH ESTIMATES OF CURRENT POLICY AND EXPANDED CAPACITY
Table 11.  THE DISCOUNTED COST OF SHUTTLE CAPACITY COMPARED WITH EQUIVALENT ELV PRODUCTION AT DIFFERENT ANNUAL FLIGHT RATES, 1987-2000
Table 12.  ESTIMATED SHUTTLE REIMBURSEMENTS UNDER SHUTTLE-ONLY SYSTEM
 
FIGURES
 
Figure 1.  HISTORICAL AND PROJECTED OFFICIAL CASE LAUNCH ACTIVITY
Figure 2.  NASA FORECASTS OF LAUNCH ACTIVITY IN 1988


 
SUMMARY

The Challenger accident has catalyzed reconsideration of national space policy. Initial discussion centered on whether to replace the Challenger with another orbiter or with expendable launch vehicles (ELVs). But the accident soon focused the policy debate on underlying questions concerning the capacity of the shuttle system, the nation's future demand for launch services, the roles of the public and private sectors in meeting them, and the U.S. share of the worldwide commercial launch market. In addressing these space transportation issues, the Congress will also determine how quickly and to what extent the nation will realize the major objectives of the civilian space program: scientific exploration of space, provision of public services with satellites, encouragement of economic growth through private-sector use of space technology, and enhancement of national prestige.

The Administration recently proposed to replace the Challenger with a new orbiter, which would be funded, in large part, by reprogramming the future NASA budget. The Administration also proposed gradually removing the shuttle system and NASA from the launch market for commercial communication satellites, with the proviso that the shuttle would fly a portion of the existing 44 launch commitments. The purpose of the shift in commercial launchings is to allow the shuttle to serve the backlog of government cargos created by the accident and, simultaneously, to encourage U.S. private firms to offer ELV services to the commercial market.

The Congress also has initiated new actions. The Senate appropriations bill for fiscal year 1987 includes full funding for a new orbiter in the Department of Defense (DoD) budget rather than in the NASA budget. A bill presented to the Space Subcommittee of the House Science and Technology Committee (H.R. 5429) proposed that NASA procure 15 Delta rockets over five years to supplement the federal launch capacity.
 

U.S. LAUNCH SUPPLY, DEMAND, AND COSTS

The Administration proposed and the Congress approved new capacity for space transportation in a 1986 supplemental appropriation. The procurement of Titan IV expendable launch vehicles was increased from 10 vehicles over five years to 23 over the same period. In addition, a new ELV program--the medium launch vehicle (MLV)--was approved and is scheduled to provide launches for four satellites annually beginning in 1989. As ELV production requires 24 to 36 months to bring new vehicles on line, and modification of the shuttle system will delay resumption of reasonable annual flight rates until 1989, the U.S. capacity to provide launch services is virtually nonexistent until that date.

Supply and Demand.

The Congressional Budget Office (CBO) estimates that in 1989 the U.S. launch systems--the three remaining orbiters, the Titan ELV production line and launch facilities, and the as yet undetermined MLV production line and launch facility--will provide a capacity to launch 21 to 24 shuttle flight equivalents annually.1 This estimate serves as a starting point to evaluate whether additional new capacity--whether orbiter or ELV--is necessary to meet the nation's space transportation requirements.

Before the Challenger accident, the launch market traditionally served by U.S. capacity--national security, civilian government, and a major share of the free world's commercial demand--was projected in official estimates to require an annual average of 30 equivalent shuttle flights from 1986 through 2000 (without including those required for the deployment of a space-based defense system or extensive new space manufacturing). These projections envisaged rapid growth in the late 1980s, with a peak of 35 flights annually during the early 1990s when the U.S. space station was to be built. This level of activity would more than quadruple the annual average launch activity from 1970 through 1985. If realized, this high level of demand would justify added launch capacity, such as that provided by a fourth orbiter.

If the historical record is a guide, NASA, DoD, and NASA contractors have consistently overestimated launch demand. Moreover, the ramifications of the accident itself should lower launch requirements by raising the cost of space transportation and by making unanticipated demands on the NASA and DoD budgets. This analysis lowers the preaccident projections of demand for 1986 through 2000 according to two other possible courses for demand. From NASA's estimate of an average of 30 shuttle flight equivalents per year, a constrained version of the official case sets an upper bound of 16.5 flights annually and a historical case projects a lower bound of 10.5 flights a year. This lower rate is based on extrapolating through the end of the century the demand over the last 15 years.

The resulting range of annual average demand--10.5 to 16.5 flights--could be served by CBO's estimated 1989 U.S. launch capacity (21 to 24 shuttle equivalents) without acquiring new launch capacity. The level of capacity estimated for 1989 ranges from 130 percent to 145 percent of projected annual demand in the constrained case and from 200 percent to 230 percent of the historical demand projection. The backlog of payloads accumulated while the shuttle is grounded, however, and the requirements of the space station, as currently planned, can be used to support arguments for procuring new capacity with a replacement orbiter or additional ELVs from existing facilities.

Costs

Before the loss of Challenger, the major issues of U.S. space transportation policy had been settled. The shuttle system was to be the primary mode of space transportation for all U.S. government payloads, because it was less costly and more capable than the older, expendable rocket technology that preceded it.

This report concludes that an additional orbiter should receive no significant cost advantage relative to expendable launch vehicles in deploying satellites. With the postaccident reduction in shuttle system capacity, shuttle costs are likely to increase, eliminating what was once a clear-cut cost advantage for additional orbiter capacity compared with ELVs. For example, between 1987 and 2000, the real discounted cost (at a 2 percent rate) of a new orbiter flown an average of three times each year is estimated to be $3.7 billion, compared with the $3.5 billion cost of comparable ELV services. If the orbiter is used more often, its cost-effectiveness improves relative to ELVs. An orbiter used an average of four times a year is estimated to cost $4.3 billion, compared with $5.0 billion for an equal ELV capacity. The demand projections developed in this analysis, however, suggest that an additional orbiter would actually experience lower demand and lower annual average flight rates. An orbiter flown only twice a year is estimated to cost up to $500 million more than comparable ELV capacity. In the face of uncertain demand, ELVs could offer the advantage of a smaller initial funding commitment.

Both the options to replace the orbiter and to acquire additional ELVs offer certain noncost advantages. ELVs would not involve as great and direct a risk to human life as shuttle flights. An additional orbiter, as indicated, would be necessary to accomplish the construction phase of the space station as currently planned and would provide a degree of insurance in the event of unanticipated growth in demand or the loss of another orbiter. But most of the benefits of the shuttle's unique capabilities and, perhaps, a space station of different design could be realized by the existing three-orbiter fleet.
 

INSTITUTIONAL OPTIONS TO PROVIDE SPACE TRANSPORTATION FOR THE COMMERCIAL MARKET

Uncertainty concerning the capacity and capability of the shuttle system has prompted new interest in ELVs as an alternative to the shuttle in the commercial launch market. But it is not obvious who should build and operate these ELVs. Several institutional options are open to the United States in pursuing its goals for space transportation policy. .

Preaccident policy for commercial space launches was strongly oriented towards shuttle technology, with NASA as the public-sector provider of U.S. launch capacity to the world market. Beginning in 1989, shuttle prices were to be established at a level approximating the long-run marginal cost of shuttle service. This price would have encouraged effective use of shuttle capacity and would have produced a surplus of current revenues over current costs, leading to a net contribution to the NASA budget. Since the federal government would incur the high fixed cost of operating the shuttle to meet federal needs whether the commercial market was served or not, pricing shuttle service to the commercial market at long-run marginal cost would allow the shuttle to capture at least 50 percent of the worldwide commercial market, without the need for government subsidies. In sum, in the preaccident environment, the United States was to become internationally competitive and economically efficient in providing space transportation, effectively using past federal investment in shuttle capacity while providing current budget support to NASA through sales to the commercial launch market.

The accident has negated this vision of the shuttle's future and its role in attaining U.S. space policy goals. The shuttle system's costs and capabilities now are uncertain; and its cargo, once flights resume in 1988, will be dominated by government payloads. Reflecting this change, the Administration has proposed commercializing U.S. ELVs by removing the federal government from the commercial market and by encouraging private enterprise to replace it. But questions can be raised about whether the ELV commercialization option would lead to an internationally competitive industry in the 1990s, and whether it would provide cost-effective use of federal space transportation capacity. The Congress may wish to consider two alternatives to ELV commercialization: allowing NASA to provide ELV services to the commercial market, and creating a mixed enterprise like Europe's Arianespace to bring an explicit public-sector/private-sector partnership into the commercial launch market. The ELV commercialization option and the two alternatives present both advantages and disadvantages when their implications are considered according to the following criteria:

The ELV commercialization option would replace the government in the commercial market with U.S. private firms. These businesses would compete on the world market, initially with Arianespace, but later with other foreign entrants into the market. U.S. private firms would provide ELVs to their customers and launch them at rented government facilities. The NASA would continue to operate the shuttle and DoD would serve its own requirements with ELVs purchased from its budget. Either DoD or NASA, however, could purchase ELV services from the private sector. Direct federal acquisition of ELVs from potential private entrants is the most important federal influence on the international competitiveness of U.S. firms, since it would reduce the unit costs of ELVs through procurement of larger numbers.

The commitment of the DoD to purchase ELVs, the backlog of pay-loads created by the Challenger accident, and only limited foreign competition could characterize an environment through the early 1990s in which U.S. private firms could become internationally competitive and economically efficient. But after that time, the dissolution of the backlog and intensified (and perhaps subsidized) foreign competition could leave U.S. producers at a competitive disadvantage.

Maintaining international competitiveness through attempting to eliminate subsidies--for example, through the General Agreement on Trade and Tariff (GATT) framework--would be most consistent with the commercialization option. Alternatives, such as providing government subsidies for operating costs or technology development to specific U.S. private firms, would be possible, although less consistent with this option's emphasis on private investment and markets. Finally, the ELV commercialization option would provide a model for the future transfer of the shuttle technology to the private sector, but it would not facilitate an easy and integrated reintroduction of the shuttle to the commercial market in the early 1990s, if that were desired.

The public sector option of allowing NASA to provide ELV services to the commercial market would offer no immediate competitive advantage compared with the other alternatives. Government regulatory requirements and administrative overhead could actually make the price NASA could offer the commercial market higher than the price a commercial ELV vendor would charge for the same service.

The NASA option suggests different U.S. responses to the changing competitive circumstances of the 1990s. Subsidies for operating existing vehicles and developing new ones could be provided more easily, but the force of U.S. arguments for free and unsubsidized competition in the launch market would be diminished accordingly. The NASA option could promote effective use of the shuttle system by including commercial cargos on shuttle flights that would be flown in any case. Nevertheless, the NASA option would maintain NASA's role as an operator of space transportation, a role critics have argued distracts NASA from its primary research function.

The mixed enterprise option would create a public/private-sector partnership. Elements of NASA, U.S. aerospace firms, and even the general public (through a stock offering) would be melded into an entity that would operate the shuttle and U.S. ELV services. The enterprise would provide services to the commercial market and federal government, possibly even including all national security needs. The enterprise would require substantial financial and administrative efforts to begin operations, and might involve some additional short-term costs relative to the other options. As under the other alternatives, the mixed enterprise option would probably gain a substantial part of the market in the early 1990s.

Advocates of a mixed enterprise option argue that it would substantially enhance U.S. competitiveness in the 1990s. Like the NASA option, the mixed enterprise alternative would offer the prospect of an integrated ELV and shuttle capacity, but unlike the NASA option, the enterprise would not maintain NASA as a system operator. The integration of federal and commercial ELV demand would also permit the most competitive U.S. ELV presence in the world market, particularly if, as some advocates suggest, the more favorable market of the interim period would permit the development of a modernized U.S. ELV. Although such new investments would be possible under the other two options, they would be less likely to occur.

This document is available in its entirety in PDF.


1. A shuttle equivalent is defined as an orbiter capable of carrying 65,000 pounds (Ibs.), launched with a 50,000 Ibs. load from the Kennedy Space Center to a low earth orbit of 28.5 degrees, 160 nautical miles above the Earth. This represents a load factor of slightly above 75 percent.