Constituent Services
Legislation Search |
2010 Surface Transportation Authorization Project Requests As
the Committee on Transportation and Infrastructure prepares legislation
to reauthorize the Safe, Accountable, Flexible, Efficient Transportation
Equity Act: A Legacy for Users (SAFETEA-LU), I have submitted the
following projects for the Committee’s consideration. I have
attached additional information regarding these projects for further
review. Below is the list of project requests in no particular
order for review: -
Construction of a joint Transportation Facility in -
Engineering, acquire right of way, construction and resurfacing of CSAH
52, in Clay County, MN $4,560,000 -
Design, engineering and construction of Crescent Parkway in -
Design and engineering of -
Design, acquire right-of-way and construct a full intersection, with
signal lights, at -
Construction of an interchange at Trunk Highway 23 and CSAH 7 in -
-
Construction of -
Construct Main/20th Street/ 21st Street Grade Separations, planning of
11th St. underpass, and ancillary improvements for City of Moorhead,
MN Comprehensive Safety Program $5,000,000 -
Construct a multi-modal Paul Bunyan State Trail Bridge over Trunk
Highway 197 near -
Construct an interchange and turning lanes at the intersection of US Hwy
10 and Otter Tail CSAH 34, near -
Minnesota River Valley National Scenic Byway, -
Construct, engineer, and acquire right-of-way for a highway overpass
over U.S. Hwy 10 and the BNSF Railroad tracks for necessary roadways to
connect Todd County CSAH 21 to Wadena CSAH 30 in Staples, MN
$6,680,000 -
Planning and construction of maintenance and administrative facility,
update fleet vehicles and corridor improvements for pedestrian traffic
to transit shelters within White Earth Tribal Nation, MN
$2,800,000 - Final Design and construction of 4-lane roadway from New London, MN to Paynesville, MN on MN State Highway 23 $12,000,000
|
Contact InformationWashington, DC Detroit Lakes Marshall Montevideo Red Lake Falls Redwood Falls Willmar |
||